Image archive – January to April 2017

13 April. Jack brought some cherry wood which got Roger thinking about some good ways to use it.

Harry evicts a wasp's nest from Shed 1. Ironic how we started building an insect hotel two days later!

Liz came down and joined in too, even bringing real food. My parsnip chips were lovely thanks!

6 April. The RWB Shed - finished.
The quality of the finish is like brand new!

Harry was the trooper with the paint brush here.
Note the elegent oak beam effect too!

The practice cars could use the same TLC!
Meanwhile we have plenty more to do inside.

23 March. Shed 1 gets finished off as Shed 2 starts coming together.

Dave does a stirling job with the angle grinder, safely burying the power cable.

Shed 1 is almost ready for action making all the wood-work projects we have planned!

16 March. David in action!

10 March. Electricity - hurrah! This shows what amazing progress has been made.

This excellent tool (bottom right) is purpose made to dismantle pallets - clever hey!

23 Feb. David sorts out the inner wall.

The Core team (l to r): John, Phil and David.

Mark cuts the timber to length with Keith.

New faces popping up everywhere today!

2 Feb. Decking roof done in time for storm.

Plastic sheet for window as temporary measure.

27 January. Alex gets stuck in straight away.

No gloves, what a brave man!

The vestibule frame and rear wall are up.

Not before some tricky fastening was done.

Alex and Mark at the start of the day.

At the end of the day it all comes together.


Part of the Men's Sheds Association.